io

20th Year

2. Etap Katı Atık Düzenli Depolama Tesisinin Fizibilite Raporu, İyileştrime Raporu, Avan Projeleri ile ÇED raporunun hazırlanması

The feasibility report and preliminary projects for the 2nd Phase of the Solid Waste Regular Storage Facility, which serves the disposal of waste from the industrial and enterprises in the region with a population of 230,000 connected to TİÇHİB, will be prepared on an area of 10.4 hectares. Additionally, the Improvement Plan for the existing facility will be prepared.

Work carried out within the scope of the project:

  1. Waste projections

  2. Determination of waste characterization through field studies,

  3. Examination of alternative technologies

  4. Development of investment and operation scenarios for the future

  5. Conceptual design and preparation of preliminary projects for the proposed systems such as Landfill Facility, Composting Facility, Leachate Treatment Facility, and Transfer Station

  6. Cost analyses based on the design have been carried out.

io Environmental Solutions Research and Development Ltd.

Contact

Istanbul

Ankara

Reşitpaşa Mah. Katar Cad. Arı Teknokent 1 2/5 D: 12 34469 Sarıyer

Phone: 0 (212) 276 65 48
Fax: 0 (212) 276 33 67
E-mail: info@iocevre.com

Copyright ©

2024

io Environmental Solutions Research and Development Ltd.

io Environmental Solutions Research and Development Ltd.

Contact

Istanbul

Ankara

Reşitpaşa Mah. Katar Cad. Arı Teknokent 1 2/5 D: 12 34469 Sarıyer

Phone: 0 (212) 276 65 48
Fax: 0 (212) 276 33 67
E-mail: info@iocevre.com

Copyright ©

2024

io Environmental Solutions Research and Development Ltd.