TÜPRAŞ İzmit Rafinerisinde Yağmur Suyu Drenajı ve Petrol Atıkları Şebekelerinin Tasarımı
As part of the project, the assessment of all existing infrastructure facilities in the field, the preparation of topographic maps showing the locations of existing infrastructure facilities, and the preparation of detailed design projects for rainwater and oily rainwater projects. The coordinates and widths of the manholes and the diameters of the connected pipes have been determined to provide the flow level and coordinates of the existing infrastructure (rainwater and oily rainwater networks). The existing location maps prepared by TÜPRAŞ have been revised. A hydraulic model has been provided in accordance with the location and level of the existing infrastructure facilities, and the proposed networks have been designed.
Description of the actual services provided by our staff within the scope of the task:
Preparation of maps showing the locations of existing and proposed stormwater and oil waste networks,
Measurement of the flow level of existing infrastructure (stormwater and oily stormwater networks) and the diameter of connecting pipes,
Design of proposed networks according to the location of existing infrastructure,
Implementation of manholes for stormwater and oily stormwater networks,
Works such as the design of stormwater collection tanks have been carried out.