Awash-Weldia (Etiyopya) Demiryolu Hidrolik & Hidrolojik Etüt Raporunun Hazırlanması ve Drenaj Projesi

The project, as the 2nd phase identified, includes the identification of openings and bridges along the route between KM= 270+000-400+000, the hydraulic design, and the assessment of flood risk, thus enabling hydraulic and hydrological studies to be carried out.

Definition of the actual services provided by our personnel within the scope of the project:

- Determining the population projection of the project area and the wastewater flow

- Preparing the preliminary project of the wastewater sewage system and collectors to serve as a basis for the implementation project

- Determining the most suitable area for the pumping station and the most suitable route for the discharge line

- Assessing the appropriateness of alternative initial investment costs, construction, operation, repair, and maintenance periods during the design phase of the wastewater collection system.

- Preparing a feasibility report to be used in tendering and loan application activities for the construction of the wastewater sewage system

io Environmental Solutions Research and Development Ltd.

Contact

Istanbul

Ankara

Reşitpaşa Mah. Katar Cad. Arı Teknokent 1 2/5 D: 12 34469 Sarıyer

Phone: 0 (212) 276 65 48
Fax: 0 (212) 276 33 67
E-mail: info@iocevre.com

Copyright ©

2024

io Environmental Solutions Research and Development Ltd.

io Environmental Solutions Research and Development Ltd.

Contact

Istanbul

Ankara

Reşitpaşa Mah. Katar Cad. Arı Teknokent 1 2/5 D: 12 34469 Sarıyer

Phone: 0 (212) 276 65 48
Fax: 0 (212) 276 33 67
E-mail: info@iocevre.com

Copyright ©

2024

io Environmental Solutions Research and Development Ltd.